Post-construction cleaning

Hand over a finished space, not a dusty one

Rough, final and touch-up cleans for general contractors, builders and tenant improvement projects. We work to your punch list and your handover date.

Who it's for

Contractors with a handover date

General contractors, tenant improvement and remodel crews, commercial builders, and owners who just finished a buildout and want to open.

  • Office and retail tenant improvements
  • Medical and dental suite buildouts
  • Restaurant and commercial remodels
Booked to your handover

What's included

Three phases, booked separately or together

Most projects need a rough clean and a final clean. A touch-up just before handover catches what trades leave behind.

Rough clean

  • Debris, offcuts and packaging removed to your dumpster
  • Floors swept and vacuumed
  • Bulk dust removed from surfaces
  • Done between trades, before flooring or paint

Final clean

  • Fine dust removed from every surface, top to bottom
  • Interior windows, frames and tracks
  • Stickers, labels and paint overspray removed from fixtures and glass
  • Cabinets and drawers inside and out
  • Light fixtures, vents and diffusers wiped
  • Restrooms cleaned and floors mopped

Touch-up clean

  • Final pass after punch-list work
  • Footprints, fingerprints and fresh dust
  • Floors and glass ready for the walkthrough
  • Photos for your closeout documents

On site

We work like a trade on your job

Our crews follow your site rules and schedule, and stay out of the way of other trades.

Your site rules

PPE, sign-in, parking and working hours as your superintendent requires.

Paperwork ready

Certificate of insurance provided before we start, with your company named as certificate holder if needed.

Scheduled to the date

Tell us the handover date and we'll book backwards from it, with a buffer for punch-list work.

Quoted separately or not included

  • Hauling debris off site (we use your dumpster or roll-off)
  • Exterior windows above the ground floor and pressure washing
  • Floor finishing, sealing or waxing

The free first cleaning offer doesn't apply to post-construction cleaning.

How it works

From bid to handover

  1. 1

    Site walk

    We walk the project with you or your super and note phases and access.

  2. 2

    Fixed bid

    A written price per phase within a day.

  3. 3

    Scheduled to your date

    Phases booked around your trades and handover.

  4. 4

    Photo closeout

    Photos of every room when we finish, ready for your closeout package.

Questions

Post-construction FAQ

All questions
How much notice do you need?

A week's notice is ideal for a final clean. For rough cleans between trades we can often fit in within a few days. Call us if your date has moved.

Do you remove construction debris?

We bag and move debris to your on-site dumpster or roll-off. Hauling off site isn't included, but we can quote it if needed.

Can you name us on your insurance certificate?

Yes. Send your certificate holder details and any additional insured requirements and we'll provide the certificate before we start.

Get a fixed price for your job

Free walkthrough and a written quote within a day.